  • Bell Manhole Rebuild – Smythe St., Fredericton, NB

    Bell Manhole Rebuild – Smythe St., Fredericton, NB

    Bell Manhole Rebuild

    Smythe St., Fredericton, NB

    Client: Bell

    Project Type: Civil Construction

    Year: 2020

    About This Project

    This project consisted of the demolition and reconstruction of a live, working communication vault. Working around an active communication network surrounded by underground high voltage power lines in the middle of a 5 way intersection added to the complexity of this project.


    Head OfficeFredericton OfficeDartmouth Office
    215 Beardsley Rd. Suite 1
    Woodstock, NB
    E7M 4E1
    8 Avery Street
    Hanwell, NB
    E3C 0E6
    10 Morris Dr
    Dartmouth, NS
    B3B 1K8
    506.328.9848506.454.1302902.468.8895
    info@k-lineconstruction.cominfo@k-lineconstruction.cominfo@k-lineconstruction.com
  • Crave Technologies – FDR Memorial Bridge Conduit Installation

    Crave Technologies – FDR Memorial Bridge Conduit Installation

    Crave Technologies – FDR Memorial Bridge Conduit Installation

    Campobello, NB / Lubec , Maine

    Client: Crave Technologies

    Project Type: Civil Construction

    Year: 2021

    About This Project

    This project consisted of design and installation of a conduit system under the bridge. The conduit was for a new fibre connection to the US to bring high speed internet to the Fundy Isles. Working on this international project during a global pandemic added to its extreme complexity.


    Head OfficeFredericton OfficeDartmouth Office
    215 Beardsley Rd. Suite 1
    Woodstock, NB
    E7M 4E1
    8 Avery Street
    Hanwell, NB
    E3C 0E6
    10 Morris Dr
    Dartmouth, NS
    B3B 1K8
    506.328.9848506.454.1302902.468.8895
    info@k-lineconstruction.cominfo@k-lineconstruction.cominfo@k-lineconstruction.com
  • NB Power Storm Restoration

    NB Power Storm Restoration

    NB Power Storm Restoration

    New Brunswick

    Client: NB Power

    Project Type: Power

    Year: 2017

    About This Project

    After a severe winter ice storm, many New Brunswickers were without power.  Our crews worked long days under winter conditions to restore power.


    Head OfficeFredericton OfficeDartmouth Office
    215 Beardsley Rd. Suite 1
    Woodstock, NB
    E7M 4E1
    8 Avery Street
    Hanwell, NB
    E3C 0E6
    10 Morris Dr
    Dartmouth, NS
    B3B 1K8
    506.328.9848506.454.1302902.468.8895
    info@k-lineconstruction.cominfo@k-lineconstruction.cominfo@k-lineconstruction.com
  • Xplornet Fibre Build

    Xplornet Fibre Build

    Xplornet Networks Fibre Build

    Hartland, NB

    Client: Xplornet

    Project Type: Telecommunication

    Year: 2019

    About This Project

    This project was part of a major New Brunswick build for Xplornet. One key element, was a river crossing using the historic Hartland Covered Bridge, the longest covered bridge in the world.


    Head OfficeFredericton OfficeDartmouth Office
    215 Beardsley Rd. Suite 1
    Woodstock, NB
    E7M 4E1
    8 Avery Street
    Hanwell, NB
    E3C 0E6
    10 Morris Dr
    Dartmouth, NS
    B3B 1K8
    506.328.9848506.454.1302902.468.8895
    info@k-lineconstruction.cominfo@k-lineconstruction.cominfo@k-lineconstruction.com
  • Hurricane Irma

    Hurricane Irma

    Hurricane Irma Restoration

    Florida, USA

    Client: Florida Power and Light

    Project Type: Power

    Year: 2017

    About This Project

    This was our second trip to Florida. K-Line regularly assists in Storm restoration along the Eastern coast of the United States.


    Head OfficeFredericton OfficeDartmouth Office
    215 Beardsley Rd. Suite 1
    Woodstock, NB
    E7M 4E1
    8 Avery Street
    Hanwell, NB
    E3C 0E6
    10 Morris Dr
    Dartmouth, NS
    B3B 1K8
    506.328.9848506.454.1302902.468.8895
    info@k-lineconstruction.cominfo@k-lineconstruction.cominfo@k-lineconstruction.com
  • Saint John River Crossing

    Saint John River Crossing

    Saint John River Crossing

    Mactaquac, NB

    Client: Bell

    Project Type: Telecommunications

    Year: 2019

    About This Project

    This project involved placing a new fibre optic cable across the Saint John River near Fredericton, NB. Using a small open water barge to help with this project required weather conditions to be perfect.


    Head OfficeFredericton OfficeDartmouth Office
    215 Beardsley Rd. Suite 1
    Woodstock, NB
    E7M 4E1
    8 Avery Street
    Hanwell, NB
    E3C 0E6
    10 Morris Dr
    Dartmouth, NS
    B3B 1K8
    506.328.9848506.454.1302902.468.8895
    info@k-lineconstruction.cominfo@k-lineconstruction.cominfo@k-lineconstruction.com